Project Manager
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Project Manager
Main menu: Construction - Library objects-
Tab manager.
Toolbar: Library objects -
Tab manager.
Command line: SPTABS.
After calling the command "Tab Manager" select "Project Manager".
Project Manager is a functional panel that controls all of the engineering networks (equipment, port, trace).
Create project
To create a project, you must:
1. Go to the tab of the project.
2. Click on "Communications". The project is created.
3. Choose how to save the project file in xml or drawing. To do this, there are in the top right corner of the Project Manager button:
"Specify project path" - it saves the project in xml file on your computer.
"Save the project in the current drawing" - it saves the project in the drawing.
If the drawing objects will be installed utilities to create a project, the project is automatically created, saved in an xml file. Xml file name will be similar to the name of the drawing.
Add new Network
Adding a new network is calling the command "Create New Network" from the context menu function bar "Project Manager".
To rename the network, you must:
1. Select network
2. Press "F2"
3. Enter a new name. Submit (button "Enter").
Make tracing
Context menu command "Make tracing" is similar to the "Automatic tracing"
Edit selected objects
To edit certain objects, you must:
1. Select objects(put a check on the objects).
2. In the context menu select "Edit checked objects".
3. In the dialog box, make the necessary manipulations (see. Template library) and submit.
Save project
By default, the project is stored in the same document dwg file xml, or in the drawing.
Saving a project occurs when you save a document dwg.